|
|
|
|
| |
The group has envisaged and commissioned the process to set up a power generation plant by 2011 that would extract and harbour energy sources such as Wind energy, Solar energy, Coal and Gas resources. The energy would be generated at a power of 50 million watts.
 |
HRG Wind Farm With a capacity of 1.25MW X 2 = 2.50 MW, the Wind Farm would be located at Gangawaram, Shimoga.
|
 |
HRG Solar Power Plant
The group is setting up a Solar Power generation plant to reach the power generation of 50 MW
|
 |
HRG Coal Based Power Plant The group has initiated Coal based Power plant set up aswell.
|
 |
HRG Gas Based Power Plant The group has initiated gas based plant Setup
|
|
|
|
|
|
|